namespace: aiwg
name: flow-elaboration-to-construction
platforms: [all]
description: Orchestrate Elaboration→Construction phase transition with iteration planning, team scaling, and full-scale development kickoff
commandHint:
argumentHint: '[project-directory] [--guidance "text"] [--interactive]'
allowedTools: 'Task, Read, Write, Glob, TodoWrite'
model: opus
category: sdlc-orchestration
orchestration: true
---
# Elaboration → Construction Phase Transition Flow
**You are the Core Orchestrator** for the critical Elaboration→Construction phase transition.
## Your Role
**You orchestrate multi-agent workflows. You do NOT execute bash scripts.**
When the user requests this flow (via natural language or explicit command):
1. **Interpret the request** and confirm understanding
2. **Read this template** as your orchestration guide
3. **Extract agent assignments** and workflow steps
4. **Launch agents via Task tool** in correct sequence
5. **Synthesize results** and finalize artifacts
6. **Report completion** with summary
## Phase Transition Overview
**From**: Elaboration (architecture proven, risks retired)
**To**: Construction (full-scale iterative development)
**Key Milestone**: Construction Phase Entry
**Success Criteria**:
- Architecture baselined and stable
- First 2 iterations planned with ready backlog
- Development process tailored and team trained
- CI/CD pipeline operational
- Iteration 0 (infrastructure) complete
**Expected Duration**: 1-2 weeks setup, 15-20 minutes orchestration
## Natural Language Triggers
Users may say:
- "Transition to Construction"
- "Start Construction phase"
- "Begin building"
- "Move to Construction"
- "Scale up for Construction"
- "Start full development"
You recognize these as requests for this orchestration flow.
## Parameter Handling
### --guidance Parameter
**Purpose**: User provides upfront direction to tailor orchestration priorities
**Examples**:
```
--guidance "Team scaling from 5 to 20 developers, need extensive onboarding"
--guidance "Fast track, minimal documentation, focus on delivery"
--guidance "Offshore team joining, need extra process documentation"
--guidance "Complex integrations, need thorough environment setup"
```
**How to Apply**:
- Parse guidance for keywords: scaling, timeline, team, infrastructure
- Adjust agent assignments (add environment-engineer for complex setup)
- Modify artifact depth (comprehensive vs minimal documentation)
- Influence priority ordering (infrastructure vs process focus)
### --interactive Parameter
**Purpose**: You ask 5-8 strategic questions to understand project context
**Questions to Ask** (if --interactive):
```
I'll ask 6 strategic questions to tailor the Construction transition to your needs:
Q1: What's your team scaling plan?
(e.g., 5→20 developers, gradual vs immediate, onshore/offshore mix)
Q2: What are your infrastructure priorities?
(Help me focus Iteration 0 on critical infrastructure needs)
Q3: What's your iteration cadence preference?
(1 week, 2 weeks, 3 weeks - affects planning depth)
Q4: How mature is your CI/CD pipeline?
(Determines infrastructure setup focus)
Q5: What's your biggest concern for Construction?
(e.g., quality, velocity, team coordination, technical debt)
Q6: Do you need specialized environments?
(e.g., compliance environments, performance testing, security scanning)
Based on your answers, I'll adjust:
- Agent assignments (infrastructure vs process focus)
- Iteration planning depth (detailed vs high-level)
- Onboarding materials (comprehensive vs minimal)
- Environment setup complexity
```
**Synthesize Guidance**: Combine answers into structured guidance string for execution
## Artifacts to Generate
**Primary Deliverables**:
- **ABM Validation Report**: Elaboration exit criteria → `.aiwg/reports/abm-validation-report.md`
- **Iteration 0 Completion Report**: Infrastructure readiness → `.aiwg/reports/iteration-0-completion.md`
- **Development Process Guide**: Tailored process → `.aiwg/planning/development-process-guide.md`
- **Iteration Plan - Sprint 1**: First iteration → `.aiwg/planning/iteration-plan-001.md`
- **Iteration Plan - Sprint 2**: Second iteration → `.aiwg/planning/iteration-plan-002.md`
- **Team Onboarding Guide**: New member guide → `.aiwg/team/onboarding-guide.md`
- **Architecture Stability Report**: Change tracking → `.aiwg/reports/architecture-stability-report.md`
- **Construction Readiness Report**: Final go/no-go → `.aiwg/reports/construction-readiness-report.md`
**Supporting Artifacts**:
- Environment setup scripts
- CI/CD pipeline configurations
- Team RACI matrix updates
- Dual-track workflow setup
## Multi-Agent Orchestration Workflow
### Step 1: Validate Architecture Baseline Milestone (ABM)
**Purpose**: Verify Elaboration phase complete before starting Construction
**Your Actions**:
1. **Check for Required Elaboration Artifacts**:
```
Read and verify presence of:
- .aiwg/architecture/software-architecture-doc.md
- .aiwg/architecture/adr/*.md
- .aiwg/requirements/supplemental-specification.md
- .aiwg/testing/master-test-plan.md
- .aiwg/risks/risk-list.md (≥70% retired)
- .aiwg/requirements/realizations/DES-UCR-*.md (behavioral specs — Layer 3)
- .aiwg/architecture/method-contracts/DES-MIC-*.md (interface contracts)
```
2. **Launch ABM Validation Agent**:
```
Task(
subagent_type="project-manager",
description="Validate Architecture Baseline Milestone criteria",
prompt="""
Read gate criteria from: $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/flows/gate-criteria-by-phase.md
Validate ABM criteria:
- Software Architecture Document BASELINED
- Executable architecture baseline OPERATIONAL
- All P0/P1 architectural risks RETIRED/MITIGATED
- ≥70% of all risks retired or mitigated
- Requirements baseline ESTABLISHED (≥10 use cases)
- Behavioral specifications COMPLETE (Layer 3):
- ≥80% of architecturally significant UCs have realizations
- State machine specs for stateful entities
- Decision tables for complex branching logic
- Method-level interface contracts for key components
- Pseudo-code specifications COMPLETE for first iteration scope (Layer 4):
- Algorithm specs for non-trivial logic
- Error handling trees for critical paths
- Data structure definitions with invariants
- Spec-to-UC traceability chain validated
- Master Test Plan APPROVED
- Development Case tailored
- Test environments OPERATIONAL
Generate ABM Validation Report:
- Status: PASS | FAIL
- Criteria checklist with evidence
- Behavioral spec coverage: X/Y use cases with realizations
- Pseudo-code spec coverage: X/Y methods with specs
- Decision: GO to Construction | NO-GO
- Gaps (if NO-GO): List missing artifacts and specs
Save to: .aiwg/reports/abm-validation-report.md
"""
)
```
3. **Decision Point**:
- If ABM PASS → Continue to Step 2
- If ABM FAIL → Report gaps, recommend extending Elaboration
- Escalate to user for executive decision if criteria partially met
**Communicate Progress**:
```
✓ Initialized ABM validation
⏳ Validating Elaboration exit criteria...
✓ ABM Validation complete: [PASS | FAIL]
```
### Step 2: Execute Iteration 0 (Infrastructure Setup)
**Purpose**: Scale infrastructure for full Construction team
**Your Actions**:
1. **Launch Infrastructure Setup Agents** (parallel):
```
# Agent 1: DevOps Engineer
Task(
subagent_type="devops-engineer",
description="Setup CI/CD pipeline and environments",
prompt="""
Setup Construction infrastructure:
CI/CD Pipeline:
- Build automation (compile, package, containerize)
- Test automation (unit, integration, E2E)
- Deployment automation (dev, test, staging)
- Quality gates (coverage, security scans)
Environments:
- Development: Per-developer or shared
- Test: Shared integration environment
- Staging: Production-like validation
- Production: Provisioned (not deployed)
Document setup in: .aiwg/working/construction/infrastructure/ci-cd-setup.md
"""
)
# Agent 2: Build Engineer
Task(
subagent_type="build-engineer",
description="Configure build and artifact management",
prompt="""
Configure build infrastructure:
- Build scripts and configurations
- Dependency management
- Artifact repository setup
- Version control branching strategy
- Build optimization (caching, parallelization)
Document in: .aiwg/working/construction/infrastructure/build-config.md
"""
)
# Agent 3: Reliability Engineer
Task(
subagent_type="reliability-engineer",
description="Setup monitoring and observability",
prompt="""
Configure monitoring infrastructure:
- Application metrics (APM)
- Infrastructure metrics
- Log aggregation and retention
- Alerting rules and escalation
- Dashboard creation
- SLO/SLI definitions
Document in: .aiwg/working/construction/infrastructure/monitoring-setup.md
"""
)
# Agent 4: Environment Engineer
Task(
subagent_type="environment-engineer",
description="Setup development environment and tools",
prompt="""
Configure development environment:
- IDE configurations and plugins
- Local development setup (Docker, etc)
- Debugging tools
- Code quality tools (linters, formatters)
- Security scanning tools
- Collaboration tools (Slack, Jira, Wiki)
Create developer setup guide: .aiwg/working/construction/infrastructure/dev-environment-guide.md
"""
)
```
2. **Synthesize Infrastructure Report**:
```
Task(
subagent_type="devops-engineer",
description="Create Iteration 0 Completion Report",
prompt="""
Read all infrastructure setup documents:
- .aiwg/working/construction/infrastructure/*.md
Create comprehensive Iteration 0 Completion Report:
1. Version Control (repository, branching, access)
2. CI/CD Pipeline (build, test, deploy status)
3. Environments (dev, test, staging operational status)
4. Monitoring & Observability (metrics, logs, alerts)
5. Collaboration Tools (chat, tracking, documentation)
6. Security (secrets management, scanning)
7. Developer Tools (IDE, debugging, quality)
Include:
- Checklist of completed items
- Outstanding items (if any)
- Access instructions for team
- Overall status: COMPLETE | INCOMPLETE
Save to: .aiwg/reports/iteration-0-completion.md
"""
)
```
**Communicate Progress**:
```
⏳ Setting up Construction infrastructure (Iteration 0)...
✓ CI/CD pipeline configured
✓ Environments provisioned (dev, test, staging)
✓ Monitoring and observability operational
✓ Development tools configured
✓ Iteration 0 complete: Infrastructure ready for full team
```
### Step 3: Tailor Development Process and Create Onboarding
**Purpose**: Finalize process for Construction and prepare team scaling
**Your Actions**:
1. **Launch Process Definition Agents** (parallel):
```
# Agent 1: Project Manager
Task(
subagent_type="project-manager",
description="Tailor Development Case for Construction",
prompt="""
Create Development Process Guide:
Iteration Configuration:
- Length: {1 week | 2 weeks | 3 weeks}
- Ceremonies: Planning, Daily Standup, Review, Retrospective
- Schedules and durations
Roles and Responsibilities:
- Update RACI matrix for Construction phase
- Define approval processes
- Establish escalation paths
Workflow:
- Definition of Ready (DoR)
- Definition of Done (DoD)
- Code review process
- Deployment process
Template: $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/development-case-template.md
Save to: .aiwg/planning/development-process-guide.md
"""
)
# Agent 2: Software Implementer
Task(
subagent_type="software-implementer",
description="Create coding and design guidelines",
prompt="""
Document technical guidelines:
Design Guidelines:
- Architecture patterns to follow
- Component boundaries
- API design standards
- Data model conventions
Programming Guidelines:
- Coding standards (language-specific)
- Naming conventions
- Error handling patterns
- Logging standards
- Documentation requirements
Test Guidelines:
- Test naming and organization
- Coverage targets
- Test data management
- Mocking strategies
Save to: .aiwg/working/construction/guidelines/
"""
)
# Agent 3: Human Resources Coordinator
Task(
subagent_type="human-resources-coordinator",
description="Create team onboarding guide",
prompt="""
Create comprehensive onboarding guide for new team members:
Week 1: Orientation
- Project overview and vision
- Architecture walkthrough
- Development environment setup
- Tool access and training
Week 2: Ramp-up
- Codebase tour
- First starter task assignment
- Pair programming sessions
- Process training
Resources:
- Key documentation links
- Team contacts and expertise areas
- FAQ and troubleshooting
- Escalation paths
Checklists:
- [ ] Accounts created
- [ ] Tools installed
- [ ] First commit completed
- [ ] Process training attended
Save to: .aiwg/team/onboarding-guide.md
"""
)
```
2. **Plan Team Training**:
```
Task(
subagent_type="training-coordinator",
description="Create training schedule for Construction team",
prompt="""
Design training program:
Process Training (2-4 hours):
- Development Case walkthrough
- Ceremony participation
- Tool usage (Jira, GitHub, Slack)
- Quality standards
Technical Training (as needed):
- Architecture overview (SAD walkthrough)
- Coding standards
- Test strategy
- Deployment process
Training Materials:
- Slide decks
- Recorded sessions
- Hands-on exercises
- Knowledge checks
Schedule:
- Session dates and times
- Attendee lists
- Completion tracking
Save to: .aiwg/team/training-schedule.md
"""
)
```
**Communicate Progress**:
```
⏳ Tailoring development process...
✓ Development Process Guide created
✓ Technical guidelines documented
✓ Team onboarding guide prepared
✓ Training schedule planned
✓ Process ready for Construction team
```
### Step 4: Plan First Two Iterations
**Purpose**: Create detailed iteration plans with ready backlog
**Your Actions**:
1. **Assess Backlog Readiness**:
```
Task(
subagent_type="requirements-analyst",
description="Validate backlog readiness for Construction",
prompt="""
Assess backlog status:
1. Count total backlog items
2. Validate Definition of Ready (DoR) for each:
- Use case documented
- Acceptance criteria defined
- Dependencies identified
- Estimates provided
- Risks assessed
3. Calculate ready backlog size (story points)
4. Assess backlog health:
- Healthy: 1.5x-2x capacity ready
- Marginal: 1x-1.5x capacity
- Starved: <1x capacity
Report:
- Total items: {count}
- Ready items: {count}
- Ready size: {story points}
- Health status: {HEALTHY | MARGINAL | STARVED}
Save to: .aiwg/working/construction/backlog-assessment.md
"""
)
```
2. **Launch Iteration Planning Agents** (sequential):
```
# Iteration 1 Planning
Task(
subagent_type="project-manager",
description="Plan Iteration 1 (conservative start)",
prompt="""
Create Iteration 1 Plan:
Configuration:
- Dates: {start} to {end}
- Team capacity: {story points} (80% of full - ramp-up factor)
- Buffer: 20% for unknowns
Work Item Selection:
- Prioritize: Must-have items first
- Include: Architecture validation items
- Avoid: High-risk items (save for Iteration 2+)
- Target: {points} including buffer
For each work item:
- ID and name
- Story points
- Priority (MoSCoW)
- Owner assignment
- Dependencies
- Acceptance criteria
Objectives:
- Validate development process
- Establish team rhythm
- Deliver first working features
Template: $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/iteration-plan-template.md
Save to: .aiwg/planning/iteration-plan-001.md
"""
)
# Iteration 2 Planning
Task(
subagent_type="project-manager",
description="Plan Iteration 2 (baseline velocity)",
prompt="""
Create Iteration 2 Plan:
Configuration:
- Dates: {start} to {end}
- Team capacity: {story points} (100% - full capacity)
- Buffer: 15% for unknowns
Work Item Selection:
- Continue priority order
- Include: More complex items
- Consider: Technical debt items
- Target: {points} including buffer
For each work item:
- ID and name
- Story points
- Priority (MoSCoW)
- Owner assignment
- Dependencies
- Acceptance criteria
Objectives:
- Establish baseline velocity
- Tackle complex features
- Refine estimation accuracy
Template: $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/iteration-plan-template.md
Save to: .aiwg/planning/iteration-plan-002.md
"""
)
```
**Communicate Progress**:
```
⏳ Planning first 2 iterations...
✓ Backlog assessed: {status}
✓ Iteration 1 planned: {points} points
✓ Iteration 2 planned: {points} points
✓ Iteration planning complete
```
### Step 5: Setup Dual-Track Workflow
**Purpose**: Establish parallel Discovery and Delivery tracks
**Your Actions**:
1. **Configure Dual-Track Process**:
```
Task(
subagent_type="project-manager",
description="Setup dual-track Discovery/Delivery workflow",
prompt="""
Configure dual-track workflow:
Discovery Track (Iteration N+1):
- Team: Requirements Analyst, Product Owner, Domain Experts
- Focus: Prepare backlog for next iteration
- Deliverables: Ready work items passing DoR
- Timing: 1 iteration ahead of Delivery
Delivery Track (Iteration N):
- Team: Developers, Testers, Component Owners
- Focus: Implement current iteration work
- Deliverables: Working software increments
- Timing: Current iteration
Synchronization:
- Handoff: End of Discovery N → Start of Delivery N
- Gate: Definition of Ready (DoR)
- Cadence: Every iteration boundary
Shared Resources:
- Software Architect (design reviews)
- Security Architect (security reviews)
- Project Manager (coordination)
Document workflow in: .aiwg/planning/dual-track-workflow.md
"""
)
```
2. **Launch Initial Tracks**:
```
# Start Discovery for Iteration 3
Task(
subagent_type="requirements-analyst",
description="Begin Discovery track for Iteration 3",
prompt="""
Initiate Discovery for Iteration 3:
1. Review product backlog priorities
2. Select candidate items for Iteration 3
3. Begin requirement elaboration:
- User stories
- Acceptance criteria
- Interface specifications
- Data contracts
4. Identify dependencies and risks
5. Coordinate with architects for feasibility
Target: Prepare {capacity * 1.5} story points
Due: Before Iteration 2 ends
Track progress in: .aiwg/working/discovery/iteration-003/
"""
)
# Confirm Delivery ready for Iteration 1
Task(
subagent_type="software-implementer",
description="Confirm Delivery track ready for Iteration 1",
prompt="""
Validate Delivery readiness for Iteration 1:
1. Confirm all Iteration 1 work items ready (DoR met)
2. Verify team assignments complete
3. Check development environment access
4. Validate CI/CD pipeline operational
5. Confirm daily standup scheduled
Report readiness status
Save to: .aiwg/working/delivery/iteration-001/readiness.md
"""
)
```
**Communicate Progress**:
```
⏳ Setting up dual-track workflow...
✓ Discovery track configured (Iteration 3)
✓ Delivery track ready (Iteration 1)
✓ Synchronization points established
✓ Dual-track workflow operational
```
### Step 6: Monitor Architecture Stability
**Purpose**: Ensure architecture remains stable during Construction startup
**Your Actions**:
```
Task(
subagent_type="architecture-designer",
description="Assess architecture stability for Construction",
prompt="""
Analyze architecture stability:
1. Review architectural changes since ABM:
- Count new ADRs created
- Identify component boundary changes
- Check technology stack modifications
- Assess integration changes
2. Calculate metrics:
- Architectural Change Rate: % changes (target <10%)
- ADR Frequency: ADRs per iteration
- Component Violations: boundary breaches (target 0)
- Prototype Divergence: % rewritten (target <30%)
3. Identify risks:
- Architecture drift indicators
- Instability patterns
- Technical debt accumulation
4. Recommendations:
- Continue as-is
- Conduct architecture review
- Adjust Construction approach
Generate Architecture Stability Report:
- Overall status: STABLE | UNSTABLE
- Metrics with targets
- Risk assessment
- Action items
Save to: .aiwg/reports/architecture-stability-report.md
"""
)
```
**Communicate Progress**:
```
⏳ Monitoring architecture stability...
✓ Architecture stability: [STABLE | UNSTABLE]
- Change rate: {X}% (target <10%)
- Component violations: {N} (target 0)
```
### Step 7: Generate Construction Readiness Report
**Purpose**: Final readiness assessment and go/no-go decision
**Your Actions**:
```
Task(
subagent_type="project-manager",
description="Generate Construction Phase Readiness Report",
prompt="""
Read all transition artifacts:
- .aiwg/reports/abm-validation-report.md
- .aiwg/reports/iteration-0-completion.md
- .aiwg/planning/development-process-guide.md
- .aiwg/planning/iteration-plan-001.md
- .aiwg/planning/iteration-plan-002.md
- .aiwg/team/onboarding-guide.md
- .aiwg/reports/architecture-stability-report.md
Generate comprehensive Construction Readiness Report:
1. Overall Status
- Construction Readiness: READY | NOT READY
- Decision: PROCEED | DEFER
2. Gate Validation (6 criteria)
- ABM Complete: {status}
- Infrastructure Ready: {status}
- Process Defined: {status}
- Iterations Planned: {status}
- Dual-Track Setup: {status}
- Architecture Stable: {status}
3. Team Readiness
- Team size and scaling status
- Training completion
- Onboarding materials ready
4. Infrastructure Readiness
- CI/CD operational
- Environments ready
- Monitoring configured
5. Backlog Readiness
- Ready backlog size vs capacity
- DoR compliance
- First 2 iterations planned
6. Decision and Next Steps
- If READY: Kickoff instructions
- If NOT READY: Gap closure plan
7. Success Metrics to Track
- Velocity targets
- Quality targets
- Schedule targets
Save to: .aiwg/reports/construction-readiness-report.md
"""
)
```
**Present Summary to User**:
```
# You present this directly (not via agent)
Read .aiwg/reports/construction-readiness-report.md
Present summary:
─────────────────────────────────────────────
Construction Phase Readiness Assessment
─────────────────────────────────────────────
**Overall Status**: {READY | NOT READY}
**Decision**: {PROCEED | DEFER}
**Gate Criteria Status**:
✓ Architecture Baseline Milestone: PASS
✓ Infrastructure (Iteration 0): COMPLETE
✓ Development Process: READY
✓ Iteration Planning: COMPLETE (2 sprints)
✓ Dual-Track Workflow: OPERATIONAL
✓ Architecture Stability: STABLE
**Team Scaling**:
- Elaboration team: {N} members
- Construction team: {M} members
- Onboarding status: READY
**Infrastructure**:
- CI/CD Pipeline: OPERATIONAL
- Environments: Dev, Test, Staging READY
- Monitoring: CONFIGURED
**Backlog**:
- Ready items: {X} story points
- Capacity ratio: {Y}x (target 1.5x-2x)
- Iteration 1: {Z} points planned
- Iteration 2: {W} points planned
**Artifacts Generated**:
- ABM Validation Report (.aiwg/reports/abm-validation-report.md)
- Iteration 0 Completion (.aiwg/reports/iteration-0-completion.md)
- Development Process Guide (.aiwg/planning/development-process-guide.md)
- Iteration Plans (.aiwg/planning/iteration-plan-*.md)
- Onboarding Guide (.aiwg/team/onboarding-guide.md)
- Architecture Stability (.aiwg/reports/architecture-stability-report.md)
- Construction Readiness (.aiwg/reports/construction-readiness-report.md)
**Next Steps**:
- Kick off Iteration 1: {date}
- First daily standup: {date}
- Discovery continues for Iteration 3
- Monitor velocity and quality metrics
─────────────────────────────────────────────
```
## Quality Gates
Before marking workflow complete, verify:
- [ ] All required artifacts generated and reviewed
- [ ] Infrastructure validated operational (Iteration 0)
- [ ] Team process defined and training scheduled
- [ ] First 2 iterations planned with ready backlog
- [ ] Dual-track workflow configured
- [ ] Architecture stability confirmed
- [ ] Construction readiness validated
## User Communication
**At start**: Confirm understanding and list artifacts to generate
```
Understood. I'll orchestrate the Elaboration → Construction transition.
This will generate:
- ABM Validation Report
- Iteration 0 Completion Report
- Development Process Guide
- Iteration Plans (first 2 sprints)
- Team Onboarding Guide
- Architecture Stability Report
- Construction Readiness Report
I'll coordinate multiple agents for infrastructure setup and planning.
Expected duration: 15-20 minutes.
Starting orchestration...
```
**During**: Update progress with clear indicators
```
✓ = Complete
⏳ = In progress
❌ = Error/blocked
⚠️ = Warning/attention needed
```
**At end**: Summary report with artifact locations and status
## Error Handling
**If ABM Not Met**:
```
❌ Elaboration phase incomplete - cannot proceed to Construction
Gaps identified:
- {list missing artifacts or incomplete criteria}
Recommendation: Extend Elaboration
- Complete missing artifacts
- Re-run: /flow-inception-to-elaboration
Contact Software Architect for architecture completion.
```
**If Infrastructure Not Ready**:
```
❌ Iteration 0 incomplete - infrastructure not operational
Issues:
- {list infrastructure gaps}
Actions:
1. Complete infrastructure setup
2. Validate CI/CD pipeline
3. Confirm environment access
Impact: Construction blocked until infrastructure ready.
```
**If Backlog Starved**:
```
⚠️ Backlog health: STARVED ({ratio}x capacity)
Ready backlog insufficient for smooth Construction start.
Actions:
1. Accelerate Discovery track
2. Simplify requirements for faster preparation
3. Consider starting with reduced team
Risk: Delivery team may be blocked waiting for work.
```
**If Architecture Unstable**:
```
⚠️ Architecture stability: UNSTABLE
Metrics:
- Change rate: {X}% (target <10%)
- Violations: {N}
Recommendation: Architecture review needed
- Stabilize architecture before scaling team
- Document pending decisions as ADRs
- Consider architecture refactoring in Iteration 1
Risk: Continued instability will impact Construction velocity.
```
## Success Criteria
This orchestration succeeds when:
- [ ] Architecture Baseline Milestone validated (ABM complete)
- [ ] Iteration 0 infrastructure setup COMPLETE
- [ ] Development process tailored and team trained
- [ ] First 2 iterations planned with ready backlog
- [ ] Dual-track workflow OPERATIONAL
- [ ] Architecture stability confirmed (<10% change)
- [ ] Construction Phase Readiness Report shows READY
- [ ] Complete audit trails archived
## Metrics to Track
**During orchestration, track**:
- Team scaling time: Days to onboard new members
- Infrastructure setup time: Iteration 0 completion
- Training completion rate: % of team trained
- Backlog readiness: Ratio to team capacity
- Architecture stability: % changes since ABM
- Cycle time: Transition duration (target: 1-2 weeks, orchestration: 15-20 min)
## References
**Templates** (via $AIWG_ROOT):
- Development Case: `templates/management/development-case-template.md`
- Iteration Plan: `templates/management/iteration-plan-template.md`
- Programming Guidelines: `templates/environment/programming-guidelines-template.md`
- Design Guidelines: `templates/environment/design-guidelines-template.md`
- Test Guidelines: `templates/environment/test-guidelines-template.md`
**Gate Criteria**:
- `flows/gate-criteria-by-phase.md` (Construction section)
**Related Flows**:
- `commands/flow-iteration-dual-track.md`
- `commands/flow-discovery-track.md`
- `commands/flow-delivery-track.md`
**Multi-Agent Pattern**:
- `docs/multi-agent-documentation-pattern.md`
**Orchestrator Architecture**:
- `docs/orchestrator-architecture.md`