namespace: aiwg
platforms: [all]
description: Analyze project state from .aiwg/ artifacts and provide contextual status with recommended next steps
commandHint:
argumentHint: [project-directory=. --interactive --guidance "text"]
allowedTools: Read, Glob, Grep, Bash
model: sonnet
category: sdlc-management
---
# Project Status
## Task
Analyze `.aiwg/` artifacts to determine project state and provide actionable status report with phase-appropriate next commands.
When invoked with `/project-status [project-directory]`:
1. **Scan** `.aiwg/` directory for artifacts
2. **Detect** current SDLC phase and workflow state
3. **Analyze** completion of phase milestones
4. **Identify** blockers and gaps
5. **Recommend** next commands based on current state
## Parameters
- **`[project-directory]`** (optional): Path to project root (default: current directory `.`)
## Inputs
Scans `.aiwg/` directory for:
- **Intake**: `intake/project-intake.md`, `solution-profile.md`, `option-matrix.md`
- **Planning**: `planning/phase-plan-*.md`, `planning/iteration-plan-*.md`
- **Requirements**: `requirements/*.md`
- **Architecture**: `architecture/SAD.md`, `architecture/ADR-*.md`
- **Risks**: `risks/risk-list.md`
- **Testing**: `testing/test-*.md`
- **Security**: `security/threat-model.md`, `security/security-*.md`
- **Quality**: `quality/code-review-*.md`, `quality/retrospective-*.md`
- **Deployment**: `deployment/deployment-plan.md`
- **Gates**: `gates/gate-*.md`
- **Handoffs**: `handoffs/handoff-*.md`
- **Decisions**: `decisions/change-*.md`
- **Team**: `team/team-profile.yaml`, `team/agent-assignments.md`
## Outputs
**Console output**: Formatted status report with phase detection, milestone progress, blockers, and recommended next steps.
## Workflow
### Step 1: Discover .aiwg/ Structure
```bash
# Check if .aiwg/ exists
ls .aiwg/ 2>/dev/null
# If not found, check for legacy intake/ directory
ls intake/ 2>/dev/null
```
**Decision**:
- If `.aiwg/` exists → proceed with analysis
- If only `intake/` exists → warn about legacy location, proceed with limited analysis
- If neither exists → report "No SDLC artifacts found. Run `/intake-wizard` to start."
### Step 2: Detect Current Phase
**Phase Detection Logic** (priority order):
1. **Pre-Inception** (No intake):
- Condition: No `.aiwg/intake/` directory OR intake files missing
- Status: "Project not started"
- Next: Choose ONE intake method:
- `/intake-wizard` (interactive generation)
- `/intake-from-codebase` (analyze existing code)
- `/intake-start` (enhance user-provided intake files)
2. **Inception** (Intake complete, no phase plan):
- Condition: Intake files present + NO `planning/phase-plan-inception.md`
- Status: "Intake complete, ready for Inception"
- Next: `/flow-concept-to-inception`
3. **Inception Active** (Phase plan exists, not complete):
- Condition: `planning/phase-plan-inception.md` exists + NO `gates/gate-inception.md` OR gate status ≠ PASSED
- Status: "Inception phase active"
- Next: Continue Inception activities, complete gate check
4. **Elaboration** (Inception gate passed, elaboration active):
- Condition: `gates/gate-inception.md` PASSED + `planning/phase-plan-elaboration.md` exists
- Status: "Elaboration phase active"
- Next: Architecture baseline, risk retirement, iteration planning
5. **Construction** (Elaboration gate passed, construction active):
- Condition: `gates/gate-elaboration.md` PASSED + `planning/iteration-plan-*.csv` exists
- Status: "Construction phase active (Iteration N)"
- Next: Feature delivery, testing, iteration assessments
6. **Transition** (Construction complete, deployment prep):
- Condition: `gates/gate-construction.md` PASSED + `deployment/deployment-plan.md` exists
- Status: "Transition phase active"
- Next: Deployment, training, hypercare monitoring
7. **Production** (Deployed):
- Condition: `deployment/production-deployment-*.md` exists with "Status: Deployed"
- Status: "In production"
- Next: Monitoring, incident response, continuous improvement
### Step 3: Analyze Phase Completeness
For detected phase, check milestone artifacts:
#### Inception Milestone Artifacts
**Required**:
- [ ] `intake/project-intake.md` - Project vision and scope
- [ ] `intake/solution-profile.md` - Profile and improvement roadmap
- [ ] `intake/option-matrix.md` - Priorities and framework application
- [ ] `planning/phase-plan-inception.md` - Inception activities
- [ ] `risks/risk-list.md` - Initial risk register
- [ ] `team/agent-assignments.md` - Agent assignments
**Optional but Recommended**:
- [ ] `architecture/ADR-001-*.md` - Initial architecture decisions
- [ ] `requirements/vision.md` - Business case and vision
- [ ] `requirements/business-case.md` - Funding and ROI
**Gate Criteria** (for `gates/gate-inception.md`):
- [ ] Stakeholder agreement on vision, scope, funding
- [ ] Critical use cases identified
- [ ] Initial risk list baselined
- [ ] Architecture direction proposed
#### Elaboration Milestone Artifacts
**Required**:
- [ ] `planning/phase-plan-elaboration.md` - Elaboration activities
- [ ] `architecture/SAD.md` - Software Architecture Document
- [ ] `architecture/executable-prototype.md` - Architectural baseline
- [ ] `requirements/use-case-*.md` - Use case specifications (3+ architecturally significant)
- [ ] `requirements/supplementary-requirements.md` - NFRs
- [ ] `planning/iteration-plan-elaboration.csv` - Iteration plan
- [ ] `risks/risk-list.md` - Updated with retired HIGH risks
**Optional but Recommended**:
- [ ] `architecture/ADR-*.md` - Multiple ADRs (5-10)
- [ ] `testing/test-strategy.md` - Test approach
- [ ] `security/threat-model.md` - Security analysis
- [ ] `deployment/cm-plan.md` - Configuration management
- [ ] `team/development-case.md` - Process tailoring
**Gate Criteria** (for `gates/gate-elaboration.md`):
- [ ] Executable architectural prototype validated
- [ ] Baseline architecture document approved
- [ ] Top 3-5 HIGH risks retired or mitigated
- [ ] Iteration plan for Construction baselined
#### Construction Milestone Artifacts
**Required**:
- [ ] `planning/iteration-plan-*.csv` - Iteration plans (multiple)
- [ ] `quality/iteration-assessment-*.md` - Iteration assessments
- [ ] `testing/test-results-*.md` - Test evidence (unit, integration, E2E)
- [ ] `requirements/use-case-*.md` - All use cases implemented
- [ ] `deployment/integration-build-plan.md` - CI/CD pipeline
**Optional but Recommended**:
- [ ] `quality/code-review-*.md` - Code review reports
- [ ] `testing/test-coverage-report.md` - Coverage metrics
- [ ] `quality/retrospective-*.md` - Sprint retrospectives
- [ ] `architecture/ADR-*.md` - Additional ADRs for design decisions
- [ ] `security/security-review-*.md` - Security validations
**Gate Criteria** (for `gates/gate-construction.md`):
- [ ] Feature set meets acceptance tests
- [ ] Test coverage targets met (60-80%+)
- [ ] Defects triaged (no open HIGH/CRITICAL)
- [ ] Deployment pipeline proven
- [ ] Performance targets validated
#### Transition Milestone Artifacts
**Required**:
- [ ] `deployment/deployment-plan.md` - Rollout plan
- [ ] `deployment/release-notes.md` - User-facing documentation
- [ ] `team/training-pack.md` - Training materials
- [ ] `deployment/support-handover.md` - Support readiness
- [ ] `testing/product-acceptance-plan.md` - Final acceptance tests
- [ ] `deployment/rollback-plan.md` - Rollback procedures
**Optional but Recommended**:
- [ ] `deployment/runbook.md` - Operational procedures
- [ ] `security/security-sign-off.md` - Security approval
- [ ] `quality/orr-checklist.md` - Operational Readiness Review
- [ ] `team/knowledge-transfer-*.md` - Knowledge handoff
- [ ] `deployment/hypercare-plan.md` - Post-launch monitoring
**Gate Criteria** (for `gates/gate-transition.md`):
- [ ] Users trained
- [ ] Release criteria met
- [ ] Support handover accepted
- [ ] Production deployment successful
- [ ] Hypercare monitoring active
### Step 4: Identify Blockers and Gaps
**Critical Blockers** (stop progress):
- Missing required artifacts for current phase
- Failed gate checks (status: FAILED or BLOCKED)
- Open HIGH/CRITICAL risks with no mitigation
- Critical decisions pending resolution
- Test coverage below threshold for profile
**Important Gaps** (slow progress):
- Optional artifacts missing (ADRs, test strategy)
- Moderate risks without mitigation plans
- Incomplete iteration assessments
- Missing retrospectives (learning opportunities)
- Security reviews overdue
**Minor Gaps** (nice to have):
- Documentation gaps (runbooks, training materials)
- Metrics not tracked
- Process improvements not documented
### Step 5: Recommend Next Commands
Based on phase and state, recommend **3-5 most relevant commands**:
#### Pre-Inception → Intake Complete
```markdown
**Recommended Next Steps**:
Choose ONE intake method:
1. **Generate intake interactively** (recommended for new projects):
- `/intake-wizard "your project description"`
- Or complete partial intake: `/intake-wizard --complete --interactive`
2. **Generate intake from codebase** (for existing projects):
- `/intake-from-codebase .`
3. **Enhance user-provided intake files** (if you manually created intake docs):
- `/intake-start .aiwg/intake/`
```
#### Intake Complete → Inception Active
```markdown
**Recommended Next Steps**:
1. **Begin Concept → Inception flow**:
- `/flow-concept-to-inception`
- Natural language: "Start Inception" or "Let's begin Inception phase"
2. **Initiate risk management**:
- `/flow-risk-management-cycle`
3. **Document architecture decisions** (if not done):
- Manually create `architecture/ADR-001-<decision>.md`
```
#### Inception Active → Elaboration
```markdown
**Recommended Next Steps**:
1. **Check Inception gate readiness**:
- `/flow-gate-check inception`
2. **If gate passed, transition to Elaboration**:
- `/flow-inception-to-elaboration .aiwg/`
3. **Blockers** (if gate not ready):
- {list missing artifacts}
- {list open HIGH risks}
- {list pending decisions}
```
#### Elaboration Active → Construction
```markdown
**Recommended Next Steps**:
1. **Build architectural baseline**:
- `/build-poc <feature-or-risk>` (for risky architecture)
- Manually create `architecture/SAD.md` and `architecture/executable-prototype.md`
2. **Evolve architecture**:
- `/flow-architecture-evolution <trigger>`
3. **Retire risks**:
- `/flow-risk-management-cycle .aiwg/`
4. **Define test strategy**:
- `/flow-test-strategy-execution <test-level>`
5. **Check Elaboration gate readiness**:
- `/flow-gate-check elaboration`
6. **If gate passed, transition to Construction**:
- `/flow-elaboration-to-construction .aiwg/`
```
#### Construction Active (Iterations)
```markdown
**Recommended Next Steps**:
1. **Run dual-track iteration** (recommended):
- `/flow-iteration-dual-track <iteration-number>`
2. **Or separate Discovery and Delivery**:
- `/flow-discovery-track <iteration-number+1>` (plan ahead)
- `/flow-delivery-track <iteration-number>` (deliver current)
3. **Execute test strategy**:
- `/flow-test-strategy-execution <test-level> <component>`
4. **Manage evolving requirements**:
- `/flow-requirements-evolution .aiwg/ --iteration <N>`
5. **Review security**:
- `/flow-security-review-cycle .aiwg/ --iteration <N>`
6. **Conduct retrospective** (end of iteration):
- `/flow-retrospective-cycle iteration <iteration-number>`
7. **Check Construction gate readiness** (when feature complete):
- `/flow-gate-check construction`
```
#### Construction → Transition
```markdown
**Recommended Next Steps**:
1. **Validate Construction gate**:
- `/flow-gate-check construction`
2. **If gate passed, transition to Transition**:
- `/flow-construction-to-transition .aiwg/`
3. **Blockers** (if gate not ready):
- {list failing tests}
- {list coverage gaps}
- {list open defects}
```
#### Transition Active → Production
```markdown
**Recommended Next Steps**:
1. **Deploy to production**:
- `/flow-deploy-to-production <blue-green|canary> <version>`
2. **Validate handoffs**:
- `/flow-handoff-checklist Construction Transition`
3. **Initiate hypercare monitoring**:
- `/flow-hypercare-monitoring <duration-days>`
4. **Check Transition gate readiness**:
- `/flow-gate-check transition`
```
#### Production (Ongoing)
```markdown
**Recommended Next Steps**:
1. **Monitor health**:
- `/project-health-check`
2. **Respond to incidents** (if issues):
- `/flow-incident-response <incident-id> <severity>`
3. **Optimize performance** (if degradation):
- `/flow-performance-optimization <trigger> <component>`
4. **Validate compliance** (periodic):
- `/flow-compliance-validation <framework>`
5. **Onboard new team members** (if team growing):
- `/flow-team-onboarding <name> <role>`
6. **Conduct retrospective** (periodic):
- `/flow-retrospective-cycle release <version>`
```
### Step 6: Generate Status Report
**Output Format**:
```markdown
# Project Status Report
**Generated**: {current date and time}
**Project**: {from intake/project-intake.md metadata, or "Unknown"}
**Profile**: {from intake/solution-profile.md, or "Not Set"}
**Priority**: {from intake/option-matrix.md Step 3 top weight, or "Not Set"}
---
## Current Phase
**Phase**: {Pre-Inception | Inception | Elaboration | Construction | Transition | Production}
**Status**: {Not Started | Active | Blocked | Complete}
**Duration**: {calculated from phase-plan dates, if available}
{Brief description of phase focus}
---
## Milestone Progress
### {Current Phase} Milestone
**Required Artifacts**: {X/Y complete}
- [x] {completed artifact 1}
- [x] {completed artifact 2}
- [ ] {missing artifact 1} ← **REQUIRED**
- [ ] {missing artifact 2} ← **REQUIRED**
**Optional Artifacts**: {X/Y complete}
- [x] {completed optional 1}
- [ ] {missing optional 1}
**Gate Criteria**: {X/Y met}
- [x] {met criterion 1}
- [ ] {unmet criterion 1} ← **BLOCKER**
---
## Risks and Blockers
### Critical Blockers (Stop Progress)
{If none: "✅ No critical blockers"}
1. **{Blocker 1}**
- Impact: {description}
- Resolution: {recommended action}
- Owner: {agent or team member}
2. **{Blocker 2}**
- Impact: {description}
- Resolution: {recommended action}
- Owner: {agent or team member}
### Important Gaps (Slow Progress)
{If none: "✅ No important gaps"}
- {Gap 1}: {description and recommendation}
- {Gap 2}: {description and recommendation}
### Active Risks
{Read from risks/risk-list.md, show top 3-5 HIGH/MEDIUM risks}
**Risk #{n}**: {risk name}
- Status: {Identified | Mitigating | Monitoring}
- Impact: {HIGH | MEDIUM}
- Mitigation: {summary of strategies}
---
## Team and Velocity
**Team Size**: {from intake/project-intake.md or team/team-profile.yaml}
**Current Iteration**: {from planning/iteration-plan-*.csv, if in Construction}
**Active Agents**: {from team/agent-assignments.md, if exists}
{If iteration data available:}
**Velocity**: {completed story points / planned story points}
**Test Coverage**: {from testing/test-coverage-report.md, if exists}
**Open Defects**: {from quality/ or testing/, if tracked}
---
## Recommended Next Steps
{Based on phase and state, show 3-5 most relevant commands}
### Immediate Actions
1. **{Command 1}**
```bash
/{command-name} {args}
```
{Why: brief explanation}
2. **{Command 2}**
```bash
/{command-name} {args}
```
{Why: brief explanation}
### Follow-Up Actions
3. **{Command 3}**
```bash
/{command-name} {args}
```
{Why: brief explanation}
4. **{Command 4}**
```bash
/{command-name} {args}
```
{Why: brief explanation}
---
## Quick Reference
**All Available Commands**:
**Intake Methods** (choose ONE):
- `/intake-wizard` - Generate intake interactively
- `/intake-from-codebase` - Generate intake by analyzing codebase
- `/intake-start` - Enhance user-provided intake files
**Phase Workflows**:
- `/flow-concept-to-inception` - Execute Inception phase
- `/flow-inception-to-elaboration` - Transition to Elaboration
- `/flow-elaboration-to-construction` - Transition to Construction
- `/flow-construction-to-transition` - Transition to Transition
- `/flow-iteration-dual-track` - Run Discovery + Delivery iteration
- `/flow-gate-check <phase>` - Validate phase gate criteria
- `/flow-risk-management-cycle` - Manage project risks
- `/flow-test-strategy-execution` - Execute test strategy
- `/flow-security-review-cycle` - Security validation
- `/flow-architecture-evolution` - Evolve architecture
- `/flow-deploy-to-production` - Deploy to production
- `/flow-hypercare-monitoring` - Post-launch monitoring
- `/project-health-check` - Overall project health
- `/project-status` - This report (refresh status)
For complete command list, see `.claude/commands/` directory.
---
**Natural Language Support**: You can use natural language instead of slash commands:
- Instead of `/project-status`, say "Where are we?" or "What's next?"
- Instead of `/flow-inception-to-elaboration`, say "Transition to Elaboration" or "Start Elaboration"
- See `.aiwg/docs/simple-language-translations.md` for complete translation table
**Tip**: Run `/project-status` (or say "Where are we?") anytime to refresh this report and see updated recommendations.
```
## Phase Progression Reference
**Master Workflow** (happy path):
```
Pre-Inception
↓
Choose ONE intake method:
- intake-wizard (interactive)
- intake-from-codebase (analyze code)
- intake-start (enhance user files)
↓
Intake Complete
↓
flow-concept-to-inception
↓
Inception (Active)
↓
[Architecture decisions, risk management, team alignment]
↓
flow-gate-check inception → PASSED
↓
flow-inception-to-elaboration
↓
Elaboration (Active)
↓
[Architectural baseline, risk retirement, use case elaboration]
build-poc (if needed)
flow-architecture-evolution
flow-risk-management-cycle
↓
flow-gate-check elaboration → PASSED
↓
flow-elaboration-to-construction
↓
Construction (Active)
↓
[Iterative development]
flow-iteration-dual-track (repeated)
OR flow-discovery-track + flow-delivery-track
flow-test-strategy-execution
flow-requirements-evolution
flow-security-review-cycle
flow-retrospective-cycle
↓
flow-gate-check construction → PASSED
↓
flow-construction-to-transition
↓
Transition (Active)
↓
[Deployment preparation]
flow-handoff-checklist
flow-deploy-to-production
flow-hypercare-monitoring
↓
flow-gate-check transition → PASSED
↓
Production
↓
[Ongoing operations]
project-health-check
flow-incident-response (as needed)
flow-performance-optimization (as needed)
flow-compliance-validation (periodic)
flow-retrospective-cycle (periodic)
```
**Continuous Flows** (run throughout lifecycle):
- `flow-risk-management-cycle` - Ongoing risk tracking
- `flow-requirements-evolution` - Living requirements management
- `flow-architecture-evolution` - Architecture refinement
- `flow-security-review-cycle` - Security validation
- `flow-change-control` - Change management
- `flow-retrospective-cycle` - Continuous improvement
**Ad-Hoc Flows** (trigger-based):
- `flow-team-onboarding` - When new team members join
- `flow-knowledge-transfer` - When expertise handoff needed
- `flow-cross-team-sync` - When coordination needed
- `flow-incident-response` - When production issues occur
- `flow-performance-optimization` - When performance degrades
- `flow-compliance-validation` - When compliance audit required
- `build-poc` - When technical risk needs validation
## Error Handling
### No .aiwg/ Directory
```markdown
# Project Status Report
**Status**: ❌ No SDLC artifacts found
The `.aiwg/` directory does not exist in this project.
**Recommended Next Steps**:
1. **Start a new SDLC project**:
```bash
/intake-wizard "your project description"
```
2. **Analyze existing codebase**:
```bash
/intake-from-codebase .
```
3. **Learn more**:
- See SDLC framework documentation: `agentic/code/frameworks/sdlc-complete/README.md`
- See phase workflows: `agentic/code/frameworks/sdlc-complete/plan-act-sdlc.md`
```
### Corrupted or Incomplete Artifacts
If artifacts exist but are malformed:
- **WARN**: "Found {artifact} but could not parse. May be incomplete or corrupted."
- **Recommendation**: "Review {artifact} manually or regenerate using {command}."
### Conflicting State
If artifacts indicate conflicting states (e.g., Elaboration gate PASSED but no Construction artifacts):
- **WARN**: "Conflicting state detected. Gate passed but next phase not started."
- **Recommendation**: "Run `/flow-{phase}-to-{next-phase}` to transition."
## Best Practices
1. **Run frequently**: Use `/project-status` at start of each work session to orient
2. **After major milestones**: Check status after completing gate checks or phase transitions
3. **When stuck**: If unsure what to do next, check status for recommendations
4. **Team coordination**: Share status report with team to align on current state
5. **Progress tracking**: Compare status reports over time to measure velocity
## Success Criteria
This command succeeds when:
- [ ] `.aiwg/` directory scanned successfully
- [ ] Current phase detected accurately
- [ ] Milestone progress calculated
- [ ] Blockers identified (if any)
- [ ] Next steps recommended (3-5 relevant commands)
- [ ] Status report formatted and output to console
## References
- @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/research-before-decision.md — Scan .aiwg/ artifacts before determining phase; base detection on actual file presence
- @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/rules/artifact-discovery.md — Artifact discovery patterns used to detect phase and milestone completeness
- @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/rules/sdlc-orchestration.md — Phase progression model and gate criteria that status detection is based on
- @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/skills/project-health-check/SKILL.md — Complementary skill that reports code and team health metrics
- @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/skills/orchestrate-project/SKILL.md — Orchestration skill that this status skill informs with phase context